3.7 Surfacing run-off plane 3.7.1 Run-off plane
with a single channel;
3.7.2 Run-off plane
with double channel;
3.7.3 Run-off plane
with hanging channel;
3.7.4 Mixed run-off planes;
3.8 Use of the shafts 3.8.1 Shafts for inspection;
3.8.2 Technical shafts;
3.8.3 Shafts for ventilation;
3.8.4 Secondary shafts
3.8.5 Multifunctional shafts
3.3 Covers
3.6. Basins
3.6.1 Basins of sedimentation
3.6.2 Basins of deviation
3.6.3 Basins of collection
3.5 Techniques
of building
of the main tunnel
3.5.1 Masonry building
3.5.2 Excavation a
nd material drawing up
techniques
3.5.3 Methods and tools used
3.5.4 Marks of the e
xcavation work
over the inner surfaces;
3.5.5 Possible dates
3.5.6 Following
maintenance works
and restoration;